- Oct 21, 2014
- 1,750
- 1,917
Took a lot longer than 3 man hours, didn't it?
Actually took less, my brother and I knocked it out in about 2 1/2 hours.
It's all prefabbed and studs already in sills. Just back them out an inch and slide em on and tighten, first floor took 45 mins, 2nd was tedious