Facilities Project Delayed One Year

Thick&ThinG8r

Member
Lifetime Member
Aug 21, 2014
2,613
4,287
The timing of this announcement seems odd. I would have thought they would have held on to this until after signing day.
This 18 class was told the butters complex would be complete in 2020 then the new complex was 2021. Someone, a recruit or parent called bullshat so they made the announcement of the new timeline. And on top of that Stickland pulls the new lockerooms out of his ass because I haven't heard one word about it.

There's also been a lot of talk about the new move in date and I haven't read them all, but based on the old timeline plus one year the actual move in date will be August of 2022.
 

YLGator

Well-Known Member
Lifetime Member
Jan 14, 2016
1,430
3,719
Been on the road for a week, so haven't been able to respond to the latest delay. Simply astounding. Committing $65M to baseball is mind boggling. As a point of reference, my daughter goes to Cal State Fullerton. The Titan baseball team has won 4 national titles and have been to 18 college world series. They are fundraising now looking to raise $6M over the next 3 years to upgrade baseball and softball facilities. $6M!. For an elite program. Yet, somehow we think it makes sense to spend $65M on baseball alone.

The excuse of course, is that we need to move baseball to build what we need for football. I think that's complete BS. From what I can see, there are plenty of other options.

1. Build the football complex where the current track/soccer field stands and move that to the new baseball location. Can't cost much to put up some stands and put down a track.

2. Move the entire football complex to the location we plan to move baseball. I could be wrong, but I don't think the football complex has to be right next to the Swamp. This would mean we'd have to rebuild a $17M IPF. Would probably raise some eyebrows, but its a whole lot cheaper than spending $65M on baseball.

3. Build the football complex where the parking structure is next to the O'Dome. Would have to give up some parking, but still better than the current plan.

All three of these options would allow us to break ground immediately and free up even more money for football. Might even free up enough to bring housing up to where it needs to be.

This whole thing is infuriating. Mizzu is spending $98M, UGA just spent $63M and South Carolina is spending $50M all on facilities that were just completed, or will be done in a year or so. Meanwhile we're talking about something that won't be done until after this year's recruiting class has already graduated.

Complete insanity.
 

FireFoley

Senior Member
Lifetime Member
Nov 19, 2014
9,338
15,063
Been on the road for a week, so haven't been able to respond to the latest delay. Simply astounding. Committing $65M to baseball is mind boggling. As a point of reference, my daughter goes to Cal State Fullerton. The Titan baseball team has won 4 national titles and have been to 18 college world series. They are fundraising now looking to raise $6M over the next 3 years to upgrade baseball and softball facilities. $6M!. For an elite program. Yet, somehow we think it makes sense to spend $65M on baseball alone.

The excuse of course, is that we need to move baseball to build what we need for football. I think that's complete BS. From what I can see, there are plenty of other options.

1. Build the football complex where the current track/soccer field stands and move that to the new baseball location. Can't cost much to put up some stands and put down a track.

2. Move the entire football complex to the location we plan to move baseball. I could be wrong, but I don't think the football complex has to be right next to the Swamp. This would mean we'd have to rebuild a $17M IPF. Would probably raise some eyebrows, but its a whole lot cheaper than spending $65M on baseball.

3. Build the football complex where the parking structure is next to the O'Dome. Would have to give up some parking, but still better than the current plan.

All three of these options would allow us to break ground immediately and free up even more money for football. Might even free up enough to bring housing up to where it needs to be.

This whole thing is infuriating. Mizzu is spending $98M, UGA just spent $63M and South Carolina is spending $50M all on facilities that were just completed, or will be done in a year or so. Meanwhile we're talking about something that won't be done until after this year's recruiting class has already graduated.

Complete insanity.

The Stench remains and probably will for a very long time. It takes many years to overcome the myriad of mistakes of an idiotic, feckless, incompetent leader. Just ask General Electric!!!
 

Swamp Donkey

Founding Member
7-14 vs P5 Fire Stricklin First
Lifetime Member
Jun 9, 2014
78,553
111,118
Founding Member
Been on the road for a week, so haven't been able to respond to the latest delay. Simply astounding. Committing $65M to baseball is mind boggling. As a point of reference, my daughter goes to Cal State Fullerton. The Titan baseball team has won 4 national titles and have been to 18 college world series. They are fundraising now looking to raise $6M over the next 3 years to upgrade baseball and softball facilities. $6M!. For an elite program. Yet, somehow we think it makes sense to spend $65M on baseball alone..
Im not aware of ANYONE in the ADO that is a football person.

Several from baseball, several.from.various female sports.

You can tell what their priorities are.
 

YLGator

Well-Known Member
Lifetime Member
Jan 14, 2016
1,430
3,719
Im not aware of ANYONE in the ADO that is a football person.

Several from baseball, several.from.various female sports.

You can tell what their priorities are.
Then they're dumb as rocks. Just look at the income statement. They are all football people!
 

rogdochar

Founding Member
RIP
Lifetime Member
Jun 14, 2014
25,397
29,513
Founding Member
Be creative at problem-solving, for Pete's sake. Need to 'gain' space = build a multi-storied parking garage on a present parking lot. Make a below-level parking with one of our operational facilities atop the parking level. That's a start.
 

Swamp Donkey

Founding Member
7-14 vs P5 Fire Stricklin First
Lifetime Member
Jun 9, 2014
78,553
111,118
Founding Member
This is the classic tactic pulled by government bureaucrats. If they want more money they always claim that the cuts must be made in some very popular program. For instance in local government, they're never going to cut the zoning department, inspections, city works, garabge or all those places that their special ed nephews and cousins work. They will always claim they have to eliminate the midnight shift of the police department, or shut down a fire department station in a rich neighborhood and another in a poor neighborhood, always calculated to produce the most public outcry.....
unless you raise taxes or pass a levy.

This is what these azzholes are doing. They plan a Taj Mahal of a baseball field, even though the current baseball field is already empty, and massive spending on everything but football... and say it all has to wait until you people send more money. Football is last even though football makes 90% of the money.

You would think we were a CUSA team by the way these people plead poverty. Its amazing that we are STILL near the top of the list in donations and revenue, we haven't spent money on anything of significance in the last 35 years, and they act penniless.
 
Last edited:

5-Star Finger

Apex predator of the political forum biome
Lifetime Member
Nov 16, 2017
5,553
13,092
You think we were a CUSA team by the way these people plead poverty. Its amazing that we are STILL near the top of the list in donations and revenue, we haven't spent money on anything of significance in the last 35 years, and they act penniless.

giphy.gif
 

rogdochar

Founding Member
RIP
Lifetime Member
Jun 14, 2014
25,397
29,513
Founding Member
Let's think. I've come up with the idea that Foley & the AAU guys have co-mingled personal funds with football profits to afford them enough $ grubstake to buy into Berkshire Hathaway and they lose too much $ penalty by withdrawing it too soon. ??
 

jaywalker72

Founding Member
Current Status: Dumper
Lifetime Member
Jun 13, 2014
845
2,080
Founding Member
People care more about the Swamp Restaurant in the comments of that tweet than Law's perfectly summed up hostage take on the matter.

Muh leisure! Where m'I gon' get muh leisure?
 

Swamp Donkey

Founding Member
7-14 vs P5 Fire Stricklin First
Lifetime Member
Jun 9, 2014
78,553
111,118
Founding Member
I liked the swamp, but there are other restaraunts. If they sell the Swamp, it is bc the Swamp's owner is happy w the price. None of my business.
 

Users who are viewing this thread

Help Users

You haven't joined any rooms.

    Birthdays

    Staff online

    Forum statistics

    Threads
    31,719
    Messages
    1,625,167
    Members
    1,644
    Latest member
    TheFoodGator